Essity.
The Challenge: Innovation in Corporate Spaces
Essity, a global leader in hygiene and health, sought to transform its work environment in the iconic Downtown Santa Fe tower. The project spanned 7 floors of office space, designed to foster collaboration and the well-being of its team.
The challenge lay in implementing a lighting system that would complement an ambitious and aesthetically demanding interior design, without compromising corporate sustainability goals or the operating budget.
The Solution: ORCA PoE
Following a rigorous selection process, Essity chose ORCA PoE as its provider for power supply and lighting control. The decision was based on three strategic pillars:
Sustainability and Carbon Footprint
One of the key differentiators was ORCA’s ability to reduce the project’s environmental impact:
Embodied Carbon Footprint: By utilizing infrastructure based on network (Ethernet) cables—rather than traditional electrical conduit and wiring—the use of construction materials was significantly reduced.
Operational Carbon Footprint: Through intelligent energy management, electricity consumption was reduced by nearly 30% compared to the initial design specifications (based on standard on/off operation).
2. Financial Efficiency
ORCA PoE demonstrated that cutting-edge technology does not necessarily have to be the most expensive option. The project was notable for:
A lower capital expenditure (CAPEX) compared to other control systems with similar capabilities.
Direct savings on the procurement of light fixtures. By eliminating the need for individual AC/DC drivers for each lamp, Essity was able to acquire standard and designer-grade fixtures at a price below the typical market rate.


3. Aesthetic and Technical Flexibility
The system enabled seamless integration with the interior design. Essity was able to select high-end decorative and technical fixtures—powered and controlled directly by ORCA nodes—thereby preserving the space's visual integrity without the constraints of conventional wiring.
Key Results
Energy Savings: Approximately 30% reduction compared to a traditional system.
Infrastructure: Comprehensive automation across seven floors of fully smart offices.
Environmental Impact: Substantial reduction in material and copper wiring usage, lowering the project's carbon footprint.
Cost Optimization: Efficient procurement of designer luminaires without integrated drivers, reducing both initial investment and replacement costs.